Two-machine no-wait flow shop scheduling problem with precedence constraints
Year of publication: |
2007
|
---|---|
Authors: | Samie, Saied ; Karimi, Behrooz |
Published in: |
Operations research proceedings 2006 : selected papers of the Annual International Conference of the German Operations Research Society (GOR), jointly organized with the Austrian Society of Operations Research (Ă–GOR) and the Swiss Society of Operations Research (SVOR), Karlsruhe, September 6 - 8 2006 ; with 79 tables. - Berlin : Springer, ISBN 3-540-69994-5. - 2007, p. 191-196
|
Subject: | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Heuristik | Heuristics |
-
Minimising total weighted earliness and tardiness on parallel machines using a hybrid heuristic
M'Hallah, Rym, (2012)
-
Effective meta-heuristics for scheduling on uninform machines with resource-dependent release dates
Li, Kai, (2015)
-
Cheng, Mingbao, (2015)
- More ...
-
A practical supply-demand hub in industrial clusters : a new perspective
Kayvanfar, Vahid, (2019)
-
Kashan, Ali Husseinzadeh, (2008)
-
Nasiri, G. Reza, (2010)
- More ...