Two-stage flow shop scheduling with dedicated machines
Year of publication: |
2015
|
---|---|
Authors: | Lin, Bertrand M. T. |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 53.2015, 4 (15.2.), p. 1094-1097
|
Subject: | flow shop scheduling | dedicated machine | makespan | maximum lateness | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Produktionssteuerung | Production control |
-
Bicriteria fabrication scheduling of two-component jobs on a single machine
Li, Yijie, (2023)
-
Batch scheduling in differentiation flow shops for makespan minimisation
Huang, Ting-chih, (2013)
-
A neural network-based algorithm for flow shop scheduling problems under fuzzy environment
Kumar, Harendra, (2020)
- More ...
-
Server scheduling on parallel dedicated machines with fixed job sequences
Cheng, T.C.E., (2019)
-
Minimizing the total weighted completion time in the relocation problem
Kononov, Alexander V., (2010)
-
Batch scheduling in differentiation flow shops for makespan minimisation
Huang, Ting-chih, (2013)
- More ...