Two-stage scheduling in shelf-board production : a case study
Year of publication: |
2014
|
---|---|
Authors: | Waldherr, Stefan ; Knust, Sigrid |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 52.2014, 13 (1.7.), p. 4078-4092
|
Subject: | production planning | assembly line | sequence-dependent changeover times | hierarchical planning | asynchonous teams | Produktionsplanung | Production planning | Fließfertigung | Assembly-line production | Scheduling-Verfahren | Scheduling problem | Arbeitsgruppe | Team | Produktionssteuerung | Production control | Durchlaufzeit | Lead time |
-
Controlling work in process during semiconductor assembly and test operations
Zhang, Chuwen, (2017)
-
An efficient heuristic for adaptive production scheduling and control in one-of-a-kind production
Li, Wei, (2011)
-
Synchronisation of production scheduling and shipment in an assembly flowshop
Chen, Jian, (2015)
- More ...
-
The bottleneck transportation problem with auxiliary resources
Waldherr, Stefan, (2015)
-
Complexity results for flow shop problems with synchronous movement
Waldherr, Stefan, (2015)
-
Waldherr, Stefan, (2017)
- More ...