Using distributed systems to control mixed-model assembly lines in realtime
Year of publication: |
2001
|
---|---|
Authors: | Bock, Stefan ; Brackel, Thomas van |
Published in: |
Operations research proceedings 2000 : selected papers of the Symposium on Operations Research (OR 2000) ; Dresden, September 9 - 12, 2000. - Berlin : Springer, ISBN 3-540-41587-4. - 2001, p. 284-289
|
Subject: | Fließfertigung | Assembly-line production | Scheduling-Verfahren | Scheduling problem | Theorie | Theory |
-
Complexity of the two-stage no-wait assembly problem with setup and removal times separated
Strusevič, Vitalij Aleksandrovič, (1991)
-
Produktionsplanung : ablauforganisatorische Aspekte
Domschke, Wolfgang, (1997)
-
Optimally solving the Alternative Subgraphs assembly line balancing problem
Scholl, Armin, (2008)
- More ...
-
Controlling mixed-model assembly lines in real-time by using distributed systems
Bock, Stefan, (2006)
-
Controlling mixed-model assembly lines in real-time by using distributed systems
Bock, Stefan, (2006)
-
Brackel, Thomas van, (2009)
- More ...