Showing 1 - 10 of 15
The standard one-machine scheduling problem consists in scheduling a set of jobs in one machine which can handle only one job at a time, minimizing the maximum lateness. Each job is available for processing at its release date, requires a known processing time and after finishing the processing,...
Persistent link: https://www.econbiz.de/10005707986
Background Blockchain technology has gained a great public interest due to the appearance of cryptocurrencies, a digital asset used for exchanging funds. Although blockchain calculations offer the benefits of security and reduced costs, blockchain is still strongly criticised for its lack of...
Persistent link: https://www.econbiz.de/10012414439
Рассматривается модель оценки результатов работы автоматизированной системы планирования производства при нечетких ограничениях и критериях. Находятся и...
Persistent link: https://www.econbiz.de/10011226933
In this paper, we deal with the scheduling problem of systems that have similar structure of the production-scheduling problem of assembly plants of discrete products. Firstly, the definition of order controlled, assembly plant of discrete productions is given, together with the problem of...
Persistent link: https://www.econbiz.de/10011252935
In this paper, we deal with the scheduling problem of systems that have similar structure of the production-scheduling problem of assembly plants of discrete products. Firstly, the definition of order controlled, assembly plant of discrete productions is given, together with the problem of...
Persistent link: https://www.econbiz.de/10010732318
Persistent link: https://www.econbiz.de/10011087033
Persistent link: https://www.econbiz.de/10011087220
Commodity prices have fallen sharply due to the global financial crisis. This has adversely affected the viability of some mining projects, including leading to the possibility of bankruptcy for some companies. These price falls reflect uncertainties and risks associated with mining projects. In...
Persistent link: https://www.econbiz.de/10009448207
PRECON S.A is a manufacturing company dedicated to produce prefabricated concrete parts to several industries as rail transportation and agricultural industries.Recently, PRECON signed a contract with RENFE, the Spanish Nnational Rail Transportation Company to manufacture pre-stressed concrete...
Persistent link: https://www.econbiz.de/10005704969
Persistent link: https://www.econbiz.de/10012219018