Showing 1 - 8 of 8
In manufacturing, control of ergonomic risks at manual workplaces is a necessity commanded by legislation, care for health of workers and economic considerations. Methods for estimating ergonomic risks of workplaces are integrated into production routines at most firms that use the assembly-type...
Persistent link: https://www.econbiz.de/10008685354
A production system which consists of a number of parallel assembly lines is considered. On each line a certain product is manufactured observing a common cycle time. By arranging the lines in a favourable manner, it is possible to increase efficiency of the production system by combining...
Persistent link: https://www.econbiz.de/10005785941
Most approaches to multi-project scheduling are based on the assumption that resources can be transferred between projects without any expense in time and cost. As this assumption often is not realistic, we generalise the multi-project scheduling problem (RCMPSP) by additionally including...
Persistent link: https://www.econbiz.de/10005785944
Assembly line balancing problems (ALBP) arise whenever an assembly line is con- figured, redesigned or adjusted. An ALBP consists of distributing the total workload for manu- facturing any unit of the products to be assembled among the work stations along the line sub- ject to a strict or...
Persistent link: https://www.econbiz.de/10005785956
Assembly line balancing problems (ALBPs) arise whenever an assembly line is configured, redesigned or adjusted. An ALBP consists of distributing the total workload for manufacturing products among the work stations along the line. On the one hand, research has focussed on developing effective...
Persistent link: https://www.econbiz.de/10005785965
Assembly line balancing problems (ALBP) consist of distributing the total workload for manufacturing any unit of the products to be assembled among the work stations along a manufacturing line as used in the automotive or the electronics industries. Usually, it is assumed that the production...
Persistent link: https://www.econbiz.de/10005785974
Assembly line balancing problems (ALBP) consist of distributing the total workload for manufacturing any unit of the products to be assembled among the work stations along a manufacturing line as used in the automotive or the electronics industries. Usually, it is assumed in research papers...
Persistent link: https://www.econbiz.de/10008549342
The sequence-dependent assembly line balancing problem Abstract Assembly line balancing problems (ALBP) arise whenever an assembly line is configured, redesigned or adjusted. An ALBP consists of distributing the total workload for manufacturing any unit of the products to be assembled among the...
Persistent link: https://www.econbiz.de/10005739726