Showing 1 - 3 of 3
Purpose: A decomposition heuristics based on multi-bottleneck machines for large-scale job shop scheduling problems (JSP) is proposed. Design/methodology/approach: In the algorithm, a number of sub-problems are constructed by iteratively decomposing the large-scale JSP according to the process...
Persistent link: https://www.econbiz.de/10011913661
In this paper we address the scheduling problem that comes from an ice cream manufacturing company. This production system can be modelled as a three stage nowait hybrid flow shop with batch dependent setup costs. To contribute reducing the gap between theory and practice we have considered the...
Persistent link: https://www.econbiz.de/10011898585
: establishing a mathematical model of multi-objective emergency logistics vehicle routing problem. And in end of the paper, we …
Persistent link: https://www.econbiz.de/10011900920