. Rather, any given heuristic may do well on some instances but will do worse on others. Indeed, even the 'best' heuristics … instance anew - a heuristic that is appropriate for the instance at hand, instead of applying always the same algorithm … the experience gained in earlier iterations to guide the underlying algorithm in later iterations. In a recent study …
Persistent link: https://www.econbiz.de/10011734733
Persistent link: https://www.econbiz.de/10011865965
This contribution summarizes recent work in the field of lot sizing and scheduling. The objective is not to give a comprehensive literature survey, but to explain differences of formal models and to provide some first readings recommendations. Our focus is on capacitated, dynamic, and...
Persistent link: https://www.econbiz.de/10011808819
This contribution discusses the measurement of (in-)stability of finite horizon production planning when done on a rolling horizon basis. As examples we review strategic capacity expansion planning, tactical master production schedulng, and operational capacitated lot sizing.
Persistent link: https://www.econbiz.de/10011808833
Persistent link: https://www.econbiz.de/10011735696
This contribution presents an efficient solution method for solving the major short-term planning problems which occur, if lot production has to be managed. In our focus are the two most important aspects, i.e. lot sizing and scheduling. Since both problems heavily interact, we propose an...
Persistent link: https://www.econbiz.de/10011737361
Zur Lösung des Economic Lot Scheduling Problems (ELSP) finden sich in der Literatur drei Ansätze mit unterschiedlich einschränkenden Annahmen: - Ansatz des gemeinsamen Produktzyklus (Common-Cycle-Approach) - Ansatz der gemeinsamen Basisperiode (Basic-Period-Approach) - Ansatz der variierenden...