Showing 1 - 2 of 2
This paper aims at postulating a novel strategy in terms of yard crane scheduling. In this study, a dynamic scheduling model using objective programming for yard cranes is initially developed based on rolling-horizon approach. To resolve the NP-complete problem regarding the yard crane...
Persistent link: https://www.econbiz.de/10009202308
In this study, a dynamic allocation model using objective programming for berth allocation and quay crane assignments was preliminarily developed based on rolling-horizon approach. Afterwards, a hybrid parallel genetic algorithm (HPGA), which combined parallel genetic algorithm (PGA) and...
Persistent link: https://www.econbiz.de/10009202529