Showing 1 - 10 of 17
This paper adopts the incomplete contracting perspective to study a firm’s continuous choice between producing an essential input in-house (full integration), contracting part of the production out (tapered integration), and contracting all of the production out (non-integration), when (i) an...
Persistent link: https://www.econbiz.de/10005792167
Persistent link: https://www.econbiz.de/10005499834
Persistent link: https://www.econbiz.de/10005322612
This paper analyses the impact of variations of product demand on the amount of internal slack in multi-plant firms in a model in which facilities can produce output at a privately known cost up to a previously-determined capacity level. In such a model, the amount of slack in the firm is shown...
Persistent link: https://www.econbiz.de/10005114255
This paper studies the factors determining plant size and interplant output allocation within the boundaries of a multiplant firm under conditions of demand uncertainty. It shows that asymmetric information between headquarters and individual plants is one factor determining plant size and...
Persistent link: https://www.econbiz.de/10005666478
Persistent link: https://www.econbiz.de/10000982533
Persistent link: https://www.econbiz.de/10000628968
Persistent link: https://www.econbiz.de/10001770681
Persistent link: https://www.econbiz.de/10001703627
Persistent link: https://www.econbiz.de/10007656717