Showing 1 - 10 of 1,671
Persistent link: https://www.econbiz.de/10010187258
Persistent link: https://www.econbiz.de/10011628422
Persistent link: https://www.econbiz.de/10011691477
Persistent link: https://www.econbiz.de/10011969051
In this paper we address the scheduling problem that comes from an ice cream manufacturing company. This production system can be modelled as a three stage nowait hybrid flow shop with batch dependent setup costs. To contribute reducing the gap between theory and practice we have considered the...
Persistent link: https://www.econbiz.de/10011898585
Persistent link: https://www.econbiz.de/10000842213
Persistent link: https://www.econbiz.de/10003852132
Persistent link: https://www.econbiz.de/10003904481
Persistent link: https://www.econbiz.de/10003908684
Persistent link: https://www.econbiz.de/10008662890