Showing 1 - 10 of 2,015
Persistent link: https://www.econbiz.de/10011628422
Persistent link: https://www.econbiz.de/10011560995
Persistent link: https://www.econbiz.de/10010493572
In a conventional dial-a-ride-system passengers are moved with the same vehicle between their pickup and their drop-off location. In a dial-a-ride-system with transfer, it is possible (or even standard) that passengers change the vehicle once or several times. Transfer Scheduling Constraints...
Persistent link: https://www.econbiz.de/10011300632
Persistent link: https://www.econbiz.de/10012154899
Persistent link: https://www.econbiz.de/10011691477
Persistent link: https://www.econbiz.de/10011894988
In this paper we address the scheduling problem that comes from an ice cream manufacturing company. This production system can be modelled as a three stage nowait hybrid flow shop with batch dependent setup costs. To contribute reducing the gap between theory and practice we have considered the...
Persistent link: https://www.econbiz.de/10011898585
Persistent link: https://www.econbiz.de/10011931297