Showing 1 - 9 of 9
We consider a novel generalization of the resource-constrained project scheduling problem (RCPSP). Unlike many established approaches for the RCPSP that aim to minimize the makespan of the project for given static capacity constraints, we consider the important real-life aspect that capacity...
Persistent link: https://www.econbiz.de/10011942632
We study the problem of determining both the structure and the schedule of projects subject to capacity constraints. We assume that those projects are flexible in the sense that the activities to be implemented are not entirely known in advance. In such a setting, decisions must be made with...
Persistent link: https://www.econbiz.de/10010531358
Persistent link: https://www.econbiz.de/10011676028
Persistent link: https://www.econbiz.de/10009738972
Persistent link: https://www.econbiz.de/10012293489
We consider a novel generalization of the resource-constrained project scheduling problem (RCPSP). Unlike many established approaches for the RCPSP that aim to minimize the makespan of the project for given static capacity constraints, we consider the important real-life aspect that capacity...
Persistent link: https://www.econbiz.de/10011655297
Persistent link: https://www.econbiz.de/10013499718
Persistent link: https://www.econbiz.de/10010208870
Entscheidungsmodell zur ressourcenbeschränkten Projektplanung flexibler Projekte -- Strukturelle Eigenschaften flexibler Projekte -- Genetischer Algorithmus zur Planung flexibler Projekte -- Qualität in flexiblen Projekten.
Persistent link: https://www.econbiz.de/10014016949