Showing 1 - 10 of 46
A mixed-model assembly line requires the solution of a short-term sequencing prob-lem, which decides on the succession of different models launched down the line.A famous solution approach stemming from the Toyota Production System is theso-called Level Scheduling (LS), which aims to distribute...
Persistent link: https://www.econbiz.de/10005870689
A mixed-model assembly line requires the solution of a short-term sequencing prob-lem which decides on the succession of different models launched down the line. Afamous solution approach stemming from the Toyota Production System is the socalled Level Scheduling, which aims at distributing the...
Persistent link: https://www.econbiz.de/10005870695
Assembly line balancing problems (ALBP) consist of distributing the total workload for manufacturing any unit of the productsto be assembled among the work stations along a manufacturing line as used in the automotive or the electronics industries.Usually, it is assumed in research papers that,...
Persistent link: https://www.econbiz.de/10005870709
The generation of leveled production schedules is of high impor-tance for mixed-model assembly lines whose parts and materials are suppliedjust-in-time by multi-level production processes. The Output Rate Variatonproblem is the standard mathematical representation of this complex levelscheduling...
Persistent link: https://www.econbiz.de/10005870722
Production processes in a wide range of industries rely on modern mixed-model assemblysystems, which allow an efficient manufacture of various models of a commonbase product on the same assembly line. In order to facilitate a just-in-time supply ofmaterials, the literature proposes various...
Persistent link: https://www.econbiz.de/10005870802
At cross docking terminals incoming deliveries of inbound trucks are unloaded,sorted, moved across the dock and nally loaded onto outboundtrucks, which immediately leave the terminal towards their next destinationin the distribution chain. Accordingly, a cross dock is a consolidationpoint in a...
Persistent link: https://www.econbiz.de/10005870693
At rail-road transshipment yards, gantry cranes move containers from freighttrains to trucks and vice versa. They constitute important entities in today'sintermodal transportation systems. Real-world yards are often partitionedinto several disjunct crane areas, so that crane interferences during...
Persistent link: https://www.econbiz.de/10005870715
Scheduling landings of aircrafts is an essential problem which is continuouslysolved as part of the daily operations of an airport control tower. All planesin the airspace of an airport are to be assigned to landing slots by the respon-sible air-trac controller. The support of this decision...
Persistent link: https://www.econbiz.de/10005870735
Assembly line balancing problems (ALBP) consist of distributing the total workload for manufacturing any unit of the products to be assembled among the work stations along a manufacturing line as used in the automotive or the electronics industries. Usually, it is assumed in research papers...
Persistent link: https://www.econbiz.de/10008549342
With increasing cost competition and product variety, providing an efficient Just-in-Time (JIT) supply has become one of the greatest challenges in the use of mixedmodelassembly line production systems. In the present paper, therefore, we proposea new approach for scheduling JIT part supply from...
Persistent link: https://www.econbiz.de/10005870694