Showing 1 - 10 of 3,036
Persistent link: https://www.econbiz.de/10012504279
Persistent link: https://www.econbiz.de/10012432227
Persistent link: https://www.econbiz.de/10012264486
Persistent link: https://www.econbiz.de/10011691477
In this paper we address the scheduling problem that comes from an ice cream manufacturing company. This production system can be modelled as a three stage nowait hybrid flow shop with batch dependent setup costs. To contribute reducing the gap between theory and practice we have considered the...
Persistent link: https://www.econbiz.de/10011898585
Persistent link: https://www.econbiz.de/10011877070
Persistent link: https://www.econbiz.de/10011931297
Persistent link: https://www.econbiz.de/10011628301
Persistent link: https://www.econbiz.de/10011628422
Persistent link: https://www.econbiz.de/10011612870