Showing 1 - 10 of 2,845
Persistent link: https://www.econbiz.de/10010360786
Persistent link: https://www.econbiz.de/10012659078
An evolutionary programming approach is used for the techno-economic analysis of a wind farm coupled with a pumped storage facility. The optimal day-ahead generating schedule is considered. Wind forecasts contain an element of random error, and several methods of addressing this uncertainty in...
Persistent link: https://www.econbiz.de/10013245885
Persistent link: https://www.econbiz.de/10013453934
With the remarkable growth of natural gas consumption and the development of renewable energy worldwide in recent years, the penetration capacity of gas-fired generators and uncertain renewable energy has significantly become larger, which poses a great challenge to the reliable and economic...
Persistent link: https://www.econbiz.de/10012193289
This paper calls for a change in paradigm in lot sizing and scheduling. Traditionally, a discrete time scale is chosen to model lot sizing and scheduling. As an alternative, the so-called block planning concept is proposed which is based on a continuous representation of time. A mixed-integer...
Persistent link: https://www.econbiz.de/10010414317
We establish the computational complexity of the problem of minimizing makespan in a flowshop, where each jobs requires a pallet the entire time, from the start of its first operation until the completion of the last operation. We prove that the problem is NP-hard in the strong sense for m =2...
Persistent link: https://www.econbiz.de/10013152472
The paper is concerned with the problem of optimal production planning in deterministic pull flow lines with multiple products. The objective is to specify the production policy that minimizes the total inventory and backlog costs overtime. Assuming constant product demands and non-decreasing...
Persistent link: https://www.econbiz.de/10012772150
The Shift Design Problem is an important optimization problem which arises when scheduling personnel in industries that require continuous operation. Based on the forecast, required staffing levels for a set of time periods, a set of shift types that best covers the demand must be determined. A...
Persistent link: https://www.econbiz.de/10013024102
Combinatorial optimization problems are usually NP-hard and the solution space of them is very large. Therefore the set of feasible solutions cannot be evaluated one by one. Artificial Bee Colony (ABC), Particle Swarm Optimization (PSO) and Genetic Algorithms (GA) are metaheuristic techniques...
Persistent link: https://www.econbiz.de/10013060468