Showing 1 - 5 of 5
This paper reports on a new solution approach for the well-known multi-mode resource-constrained project scheduling problem (MMRCPSP). This problem type aims at the selection of a single activity mode from a set of available modes in order to construct a precedence and a (renewable and...
Persistent link: https://www.econbiz.de/10008468958
In this paper we present a genetic algorithm for the multi-mode resource-constrained project scheduling problem (MRCPSP), in which multiple execution modes are available for each of the activities of the project. In contrast to a conventional genetic algorithm, we apply a bi-population genetic...
Persistent link: https://www.econbiz.de/10004983014
In the last few decades, several effective algorithms for solving the resource-constrained project scheduling problem have been proposed. However, the challenging nature of this problem, summarised in its strongly NP-hard status, restricts the effectiveness of exact optimisation to relatively...
Persistent link: https://www.econbiz.de/10004983122
In the last few decades the resource-constrained project scheduling problem has become a popular problem type in operations research. However, due to its strongly NP-hard status, the effectiveness of exact optimisation procedures is restricted to relatively small instances. In this paper we...
Persistent link: https://www.econbiz.de/10004983143
In the past decades, resource parameters have been introduced in project scheduling literature to measure the scarceness of resources of a project instance. In this paper, we use these resource scarceness parameters to differentiate in the search process needed to solve the multi-mode resource...
Persistent link: https://www.econbiz.de/10005007707