Showing 1 - 10 of 56
We consider a novel generalization of the resource-constrained project scheduling problem (RCPSP). Unlike many established approaches for the RCPSP that aim to minimize the makespan of the project for given static capacity constraints, we consider the important real-life aspect that capacity...
Persistent link: https://www.econbiz.de/10012502870
We study the problem to simultaneously decide on the structures and the schedules for an entire portfolio of flexible projects. The projects are flexible as alternative technologies and procedures can be used to achieve the respective project task. The choice between different technologies and...
Persistent link: https://www.econbiz.de/10014503850
We consider a novel generalization of the resource-constrained project scheduling problem (RCPSP). Unlike many established approaches for the RCPSP that aim to minimize the makespan of the project for given static capacity constraints, we consider the important real-life aspect that capacity...
Persistent link: https://www.econbiz.de/10011942632
Persistent link: https://www.econbiz.de/10011676028
Persistent link: https://www.econbiz.de/10012293489
Persistent link: https://www.econbiz.de/10013499718
Persistent link: https://www.econbiz.de/10014326807
Persistent link: https://www.econbiz.de/10001303158
Persistent link: https://www.econbiz.de/10001471629
Persistent link: https://www.econbiz.de/10002856210