Showing 51 - 60 of 25,502
In this paper we address the scheduling problem that comes from an ice cream manufacturing company. This production system can be modelled as a three stage nowait hybrid flow shop with batch dependent setup costs. To contribute reducing the gap between theory and practice we have considered the...
Persistent link: https://www.econbiz.de/10011898585
Purpose: To estimate the transition rates corresponding to the 2010 and 2012 elections to the Catalan Parliament for the four constituencies in which Catalonia is divided for this purpose. The main features of the results, which are obtained by means of mathematical programming, are commented....
Persistent link: https://www.econbiz.de/10011914104
Persistent link: https://www.econbiz.de/10011915213
Persistent link: https://www.econbiz.de/10011950474
Persistent link: https://www.econbiz.de/10011931297
Persistent link: https://www.econbiz.de/10011969051
Persistent link: https://www.econbiz.de/10011847448
Persistent link: https://www.econbiz.de/10011492058
Persistent link: https://www.econbiz.de/10011312315
Persistent link: https://www.econbiz.de/10011313083