Showing 21 - 30 of 35,675
Introduction -- Literature Review -- Single-Stage Service Level and Tardiness Model -- Simultaneous Capacity and Planned Lead Time Optimization -- Optimal Composition of Number and Size of Machines -- Service Level Constraint Models -- Conclusion.
Persistent link: https://www.econbiz.de/10014425555
Persistent link: https://www.econbiz.de/10003646260
Persistent link: https://www.econbiz.de/10003704456
Persistent link: https://www.econbiz.de/10003633007
Persistent link: https://www.econbiz.de/10003788806
Persistent link: https://www.econbiz.de/10003951859
Purpose: The theory of constraints (TOC) methodology and its drum-buffer-rope (DBR) production planning and control system are well suited to managing production plants in complex environments. The objective of this study was to design an evolution of the systematic process for implementing the...
Persistent link: https://www.econbiz.de/10014513001
Persistent link: https://www.econbiz.de/10012193670
Persistent link: https://www.econbiz.de/10003650572
Persistent link: https://www.econbiz.de/10003781000