Showing 61 - 70 of 24,814
Persistent link: https://www.econbiz.de/10011876295
Persistent link: https://www.econbiz.de/10009731366
Persistent link: https://www.econbiz.de/10009670295
Persistent link: https://www.econbiz.de/10010349466
Persistent link: https://www.econbiz.de/10011628422
Persistent link: https://www.econbiz.de/10011655108
Persistent link: https://www.econbiz.de/10011655152
Persistent link: https://www.econbiz.de/10012193235
In this paper we address the scheduling problem that comes from an ice cream manufacturing company. This production system can be modelled as a three stage nowait hybrid flow shop with batch dependent setup costs. To contribute reducing the gap between theory and practice we have considered the...
Persistent link: https://www.econbiz.de/10011898585
Persistent link: https://www.econbiz.de/10014382316