Bujak, Janusz - In: Energy 34 (2009) 9, pp. 1260-1270
reduction in the primary fuel used by about 40,300Nm3 per year if the model is applied. The optimization system can be put into … operation in existing and proposed plants. The payback period on investment for the optimization controller is less than half a …