A further study on two-agent parallel-batch scheduling with release dates and deteriorating jobs to minimize the makespan
Year of publication: |
16 February 2019
|
---|---|
Authors: | Gao, Yuan ; Yuan, Jinjiang ; Ng, C. T. ; Cheng, T. C. E. |
Published in: |
European journal of operational research : EJOR. - Amsterdam : Elsevier, ISSN 0377-2217, ZDB-ID 243003-4. - Vol. 273.2019, 1 (16.2.), p. 74-81
|
Subject: | Parallel-batch | Two agents | Release dates | Deterioration | Durchlaufzeit | Lead time | Scheduling-Verfahren | Scheduling problem | USA | United States | Theorie | Theory |
-
Competitive two-agent scheduling with deteriorating jobs on a single parallel-batching machine
Tang, Lixin, (2017)
-
Unbounded parallel-batch scheduling with drop-line tasks
Gao, Yuan, (2019)
-
Epstein, Leah, (2016)
- More ...
-
Gao, Yuan, (2022)
-
Parallel-batch scheduling of deteriorating jobs with release dates to minimize the makespan
Li, Shisheng, (2011)
-
Fu, Ruyan, (2013)
- More ...