A new bottleneck-based heuristic for reentrant job shops: a case study in a textile factory
Year of publication: |
2009
|
---|---|
Authors: | Topaloglu, Seyda ; Kilincli, Gamze |
Published in: |
Operations research proceedings 2008 : selected papers of the annual international conference of the German Operations Research Society (GOR) University of Augsburg, September 3 - 5, 2008. - Berlin : Springer, ISBN 978-3-642-00141-3. - 2009, p. 159-164
|
Subject: | Textilindustrie | Textile industry | Scheduling-Verfahren | Scheduling problem | Heuristik | Heuristics | Engpass | Bottleneck |
-
Profit-oriented scheduling of resource-constrained projects with flexible capacity constraints
Schnabel, André, (2017)
-
Ho, Tseng-Fung, (2008)
-
Heuristic algorithms for scheduling of a batch processor in automobile gear manufacturing
Gokhale, Ravindra, (2011)
- More ...
-
A constraint programming-based solution approach for medical resident scheduling problems
Topaloglu, Seyda, (2011)
-
Topaloglu, Seyda, (2009)
-
A scheduling problem in blocking hybrid flow shop robotic cells with multiple robots
Elmi, Atabak, (2013)
- More ...