Application of a mathematical model to an intermediate- to long-term real-world steel production planning problem based on standard software
Year of publication: |
2011
|
---|---|
Authors: | Witt, Andreas ; Voß, Stefan |
Published in: |
European journal of industrial engineering : EJIE. - Genevè : Inderscience Enterprises Ltd., ISSN 1751-5254, ZDB-ID 2384377-9. - Vol. 5.2011, 1, p. 81-100
|
Subject: | Produktionsplanung | Production planning | Losgröße | Lot size | Software | Mathematische Optimierung | Mathematical programming | Stahlindustrie | Steel industry | Deutschland | Germany |
-
Coil batching to improve productivity and energy utilization in steel production
Tang, Lixin, (2016)
-
An improved lagrangean relaxation algorithm for the dynamic batching decision problem
Tang, Lixin, (2011)
-
Optimal and heuristic lead-time quotation for an integrated steel mill with a minimum batch size
Slotnick, Susan A., (2011)
- More ...
-
Job shop scheduling with buffer constraints and jobs consuming variable buffer space
Witt, Andreas, (2010)
-
Hybrid flow shop scheduling with batching requirements
Voß, Stefan, (2004)
-
Batching in der Produktionsplanung : Projektplanung mit reihenfolgeabhängigen Rüstkosten
Voß, Stefan, (2003)
- More ...