Optimal and heuristic lead-time quotation for an integrated steel mill with a minimum batch size
Year of publication: |
2011
|
---|---|
Authors: | Slotnick, Susan A. |
Published in: |
European journal of operational research : EJOR. - Amsterdam : Elsevier, ISSN 0377-2217, ZDB-ID 243003-4. - Vol. 210.2011, 3 (1.5.), p. 527-536
|
Subject: | Heuristik | Heuristics | Stahlindustrie | Steel industry | Losgröße | Lot size | Scheduling-Verfahren | Scheduling problem | Produktionsplanung | Production planning |
-
Lot-sizing in a multi-stage flow line production system with energy consideration
Masmoudi, Oussama, (2017)
-
Trigos, Federico, (2016)
-
Single-machine capacitated lot-sizing and scheduling with delivery dates and quantities
Boctor, Fayez F., (2022)
- More ...
-
Order acceptance and scheduling: A taxonomy and review
Slotnick, Susan A., (2011)
-
Optimal and heuristic lead-time quotation for an integrated steel mill with a minimum batch size
Slotnick, Susan A., (2011)
-
Supply chain disclosure and ethical sourcing
Chen, Jen-Yi, (2015)
- More ...