Mechanism to minimise the assembly time with feeder assignment for a multi-headed gantry and high-speed SMT machine
Year of publication: |
1-15 May 2017
|
---|---|
Authors: | Han, Jihee ; Seo, Yoonho |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 55.2017, 9/10 (1/15.5.), p. 2930-2949
|
Subject: | PCB assembly | assembly planning | pick-and-place | SMT machine | feeder assignment | Fließfertigung | Assembly-line production | Scheduling-Verfahren | Scheduling problem | Produktionsplanung | Production planning | Durchlaufzeit | Lead time | Produktionssteuerung | Production control |
-
Controlling work in process during semiconductor assembly and test operations
Zhang, Chuwen, (2017)
-
Two-stage scheduling in shelf-board production : a case study
Waldherr, Stefan, (2014)
-
Multi-Stage assembly flow shop with setup time and release time
Sheikha, Shaya, (2019)
- More ...
-
Evaluation mechanism for structural robustness of supply chain considering disruption propagation
Han, Jihee, (2016)
-
An efficient genetic algorithm for the traveling salesman problem with precedence constraints
Moon, Chiung, (2002)
-
Integrated manufacturing planning for an AGV-based FMS
Seo, Yoonho, (1999)
- More ...