Minimizing the Sum of Earliness and Tardiness in the Multi-Factory Two-Stage Assembly Scheduling Problem
Year of publication: |
[2023]
|
---|---|
Authors: | Kazemi, Hamed ; Nourelfath, M. ; Gendreau, Michel |
Publisher: |
[S.l.] : SSRN |
Subject: | Scheduling-Verfahren | Scheduling problem | Fließfertigung | Assembly-line production | Produktionsplanung | Production planning | Branch-and-Bound | Branch and Bound | Algorithmus | Algorithm | Theorie | Theory |
-
Nekoiemehr, N., (2011)
-
Two-machine flow shop scheduling to minimize the sum of maximum earliness and tardiness
Moslehi, G., (2009)
-
Schaller, Jeffrey, (2019)
- More ...
-
Production planning with uncertainty in the quality of raw materials : a case in sawmills
Zanjani, MasoumehKazemi, (2011)
-
A scenario decomposition approach for stochastic production planning in sawmills
Kazemi Zanjani, M., (2013)
-
Artificial neural networks for reliability maximization under budget and weight constraints
Nourelfath, M., (2005)
- More ...