Productivity enhancement of assembly line by using Maynard operation sequence technique after identification of lean wastages
Year of publication: |
2020
|
---|---|
Authors: | Kumar, Raj ; Kalra, Parveen ; Kant, Suman |
Published in: |
International journal of productivity and quality management : IJPQM. - Olney, Bucks : Inderscience Enterprises, ISSN 1746-6482, ZDB-ID 2232968-7. - Vol. 29.2020, 4, p. 463-482
|
Subject: | Maynard operation sequence technique | MOST | predetermined motion time system | PMTS | productivity | lean wastages | non-value-added activity | assembly line | standard time | line layout | Fließfertigung | Assembly-line production | Lean Production | Lean production | Scheduling-Verfahren | Scheduling problem | Produktionssteuerung | Production control |
-
Increasing production rate in Kanban controlled assembly lines through preventive maintenance
Ruifeng, Chen, (2012)
-
Sternatz, Johannes, (2014)
-
Two-stage scheduling in shelf-board production : a case study
Waldherr, Stefan, (2014)
- More ...
-
Hundal, Gagan Preet Singh, (2017)
-
Modelling the machine loading problem of FMSs and its solution using a tabu-search-based heuristic
Sarma, U.M.B.S., (2002)
-
Indian federal finance : (a study of Haryana)
Kumar, Raj, (2000)
- More ...