SCHEDULING PROPORTIONALLY DETERIORATING JOBS IN TWO-MACHINE OPEN SHOP WITH A NON-BOTTLENECK MACHINE
Year of publication: |
2011
|
---|---|
Authors: | LI, SHISHENG |
Published in: |
Asia-Pacific Journal of Operational Research (APJOR). - World Scientific Publishing Co. Pte. Ltd., ISSN 1793-7019. - Vol. 28.2011, 05, p. 623-631
|
Publisher: |
World Scientific Publishing Co. Pte. Ltd. |
Subject: | Scheduling | deteriorating jobs | open shop | non-bottleneck machine | FPTAS |
-
Ji, Min, (2013)
-
SINGLE-MACHINE SCHEDULING WITH PROPORTIONALLY DETERIORATING JOBS SUBJECT TO AVAILABILITY CONSTRAINTS
LI, SHISHENG, (2012)
-
Two-agent scheduling in open shops subject to machine availability and eligibility constraints
Su, Ling-Huey, (2015)
- More ...
-
Yuan, Jinjiang, (2009)
-
Li, Shisheng, (2010)
-
Parallel-batch scheduling of deteriorating jobs with release dates to minimize the makespan
Li, Shisheng, (2011)
- More ...