Showing 1 - 10 of 18
Persistent link: https://www.econbiz.de/10003375598
Persistent link: https://www.econbiz.de/10002856210
Persistent link: https://www.econbiz.de/10001379220
Persistent link: https://www.econbiz.de/10003935919
We present a detailed analysis of the patient and resource scheduling problem in rehabilitation hospitals. In practice, the predominantly therapeutical treatments and activities which are prescribed for the patients are typically scheduled manually. This leads to rigid and inefficient schedules...
Persistent link: https://www.econbiz.de/10008906834
This paper presents a new algorithm for the dynamic Multi-Level Capacitated Lot Sizing Problem with Setup Carry-Overs (MLCLSP-L). The MLCLSP-L is a big-bucket model that allows the production of any number of products within a period, but it incorporates partial sequencing of the production...
Persistent link: https://www.econbiz.de/10003711685
Persistent link: https://www.econbiz.de/10003511840
Persistent link: https://www.econbiz.de/10009533472
We study the problem of determining both the structure and the schedule of projects subject to capacity constraints. We assume that those projects are flexible in the sense that the activities to be implemented are not entirely known in advance. In such a setting, decisions must be made with...
Persistent link: https://www.econbiz.de/10010531358
Persistent link: https://www.econbiz.de/10011338143