A continuous time model for multiple yard crane scheduling with last minute job arrivals
Year of publication: |
2012
|
---|---|
Authors: | Li, Wenkai ; Goh, Mark ; Wu, Yong ; Petering, M.E.H. ; de Souza, R. ; Wu, Y.C. |
Published in: |
International journal of production economics. - Amsterdam [u.a.] : Elsevier, ISSN 0925-5273, ZDB-ID 10925260. - Vol. 136.2012, 2, p. 332-344
|
Saved in:
Saved in favorites
Similar items by person
-
A continuous time model for multiple yard crane scheduling with last minute job arrivals
Li, Wenkai, (2012)
-
Discrete time model and algorithms for container yard crane scheduling
Li, Wenkai, (2009)
-
Discrete time model and algorithms for container yard crane scheduling
Li, Wenkai, (2009)
- More ...