Discrete time model and algorithms for container yard crane scheduling
Container terminal (CT) operations are often bottlenecked by slow YC (yard crane) movements. PM (prime mover) queues in front of the YCs are common. Hence, efficient YC scheduling to reduce the PM waiting time is critical in increasing a CT's throughput. We develop an efficient model for YC scheduling by taking into account realistic operational constraints such as inter-crane interference, fixed YC separation distances and simultaneous container storage/retrievals. Among them, only inter-crane interference has ever been considered in the literature. The model requires far fewer integer variables than the literature by using bi-index decision variables. We show how the model can be solved quickly using heuristics and rolling-horizon algorithm, yielding close to optimal solutions in seconds. The solution quality and solution time are both better than the literature even with additional constraints considered. The proposed formulations and algorithms can be extended to other problems with time windows and space constraints.
Year of publication: |
2009
|
---|---|
Authors: | Li, Wenkai ; Wu, Yong ; Petering, M.E.H. ; Goh, Mark ; Souza, Robert de |
Published in: |
European Journal of Operational Research. - Elsevier, ISSN 0377-2217. - Vol. 198.2009, 1, p. 165-172
|
Publisher: |
Elsevier |
Keywords: | Scheduling Rolling-horizon algorithm Container yard MILP |
Saved in:
Online Resource
Saved in favorites
Similar items by person
-
Discrete time model and algorithms for container yard crane scheduling
Li, Wenkai, (2009)
-
A continuous time model for multiple yard crane scheduling with last minute job arrivals
Li, Wenkai, (2012)
-
A continuous time model for multiple yard crane scheduling with last minute job arrivals
Li, Wenkai, (2012)
- More ...