Mathematical models for capacitated multi-level production planning problems with linked lot sizes
Year of publication: |
2011
|
---|---|
Authors: | Wu, Tao ; Shi, Leyuan |
Published in: |
International journal of production research : American Institute of Industrial Engineers ; Society of Manufacturing Engineers. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 1604776. - Vol. 49.2011, 20 (15.10.), p. 6227-6248
|
Saved in:
Saved in favorites
Similar items by person
-
Mathematical models for capacitated multi-level production planning problems with linked lot sizes
Wu, Tao, (2011)
-
An optimization framework for solving capacitated multi-level lot-sizing problems with backlogging
Wu, Tao, (2011)
-
An MIP-based interval heuristic for the capacitated multi-level lot-sizing problem with setup times
Wu, Tao, (2012)
- More ...